Fabrication  

 

FABRICATION

By faithfully following all the technical specifications of the projects, our company applies certified construction and control protocols.
 
CONSTRUCTION PROTOCOL
 
Design Stage:
  • A static solution of buildings and modeling of construction
  • Production of Drawings ( GA Drawings)
  • Cutting Plans and Assembly Plans
  • Material Lists
  • Drawings
 
Construction Stage:
  • Automatic shot blasting
  • Automatic cutting and drilling of all pieces by CNC machines
  • Assembling and welding
  • Shot blasting before painting
  • Painting according to project properties
 
Certificates of Materials and Staff:
  • Steel Mill certificates
  • Bolts, Nuts, Washer, Anchors certificates
  • Painting System certificate
  • Special materials certificate (Panel, Decking, etc.)
  • Welding wire and gasses certificate
  • Approved welders with all certificates
  • WPQR and WPS for welding procedures
  • Design Manager: Mechanical Engineer
  • Steel Production Manager: Mechanical Engineer